request more information contact us
company profile services safety what's new calculators
sitemap / search



gulf grid interactive map

Charts and Graphs

Animated Rig Process | Calculators | Charts and Graphs | Diesel Hammers | GRL Weap™ Analysis Program | Hammer Department Specifications | Welding Capabilities

As with all departments, Accountability to our Clients is a must. As stated in Premiere's Core Values, “We  expect excellence and we take responsibility. Our business and Customer require it."

Throughout our Hammer Job, Premiere's operators are required to keep a minute to minute log which includes Handling, Standby, Welding/connector Makeup, Cooling, Removing of padeyes, rigging up and lowering of the hammer, and driving times. As can be seen on the Main Pass 57 well data, 9 hours and 13 minutes was the total time needed from the time of picking up the first joint to the completion of the last joint. The job was performed by a 7 man crew with a run rate of 5.91 tons per hour.

Premiere also includes a Blow Count Chart for every well. This chart includes the actual blows per foot obtained during the driving process. Using Premiere's Online Gulf Grid Interactive Map, Clients are able to review current and future areas by downloading the PDF files for upcoming job analysis and past completed jobs.

All data is kept in Premiere's database and is accessible by Customer Username and Password on Premiere's Online Gulf Grid Interactive Map.


 Hammer Summary Spreadsheet (Minute to Minute Job Report)

 Hammer General Information Specifications (Minute to Minute Job Log Report)

 Hammer Labor Only Chart

 Hammer Equipment Only Chart

 Hammer Blow Count Chart

home